The bath installation was started, then we had to wait for the tiles to arrive.
The insulating and the plaster boarding between the oak beams was the next job to be done.
Batons were fitted to the beams then fibre glass insulation was fitted the the board was fixed.
The weather was fantastic allowing all the cutting to be done outside
Then it was time to plaster
You can see why we really needed the bath to be finished.
|