Once the plaster had dried the fished inserts were painted .
With spring well here the Rayburn was no longer needed everyday to supply heat a hob and extractor hood were installed.
Reclaimed oak from upstairs was used to form a mantle piece above the fire.
The weather was fantastic allowing all the cutting to be done outside
The garden had been dug and planted
Now the warmer weather was here it was time to start to finish off the final external opening
The rain water recovery pump and controller were installed now all the toilets use rain water for flushing. |